Neidrauer Adventures Photo Album and Blog
»
Building a Live Steam Locomotive - the Mikado Project
»
Section 8 - Motion Structure
WaterPumpFinishAssembled13Jan08
[63 of 63]
Keyboard shortcuts are active:
RIGHT arrow - next page
LEFT arrow - previous page
Page Up - index page
HOME - first page
END - last page
ESC,S,s - toggle start/stop slide show
ExhibitPlus
13-Jan-08 Ball checks installed, water fittings installed, gasket cut and fitted, and o-rings placed on the two rams. Ready to go on the frame. I might not even paint it.