Saturday 6-Feb-10. Another wet, snowy day outside means no track work, we retreat to the shop instead! Bill and I drill and tap for eight 10-32 screws to hold the smokebox onto the boiler. This was a hand drill/hand tap operation.
Keyboard shortcuts are active:
RIGHT arrow - next page LEFT arrow - previous page Page Up - index page HOME - first page END - last page ESC,S,s - toggle start/stop slide show