21-Feb-09 It's lousy weather outside today, nothing can be done at the track so into the shop we go. Using the same DRO bolt circle program, we have made marks on the rim of the shell for the steam pipe, handrails, and smokestack holes to go on the side of the shell. Using the rim marks and the combination square, the hole locations are marked on the side.